Emissions permit granted (BImSchG)MTU

EdgeConneX Heusenstamm GmbH data centre in Heusenstamm, Germany

Latest document dated 16 Feb 2026, from Regierungspräsidium Darmstadt. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
42
MW of generator thermal input
305

The backup fleet in the filing

Each block is one generator set: 42 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Emissions permit granted (BImSchG)

    Regierungspräsidium Darmstadt. Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordDE-HE-HEUSENSTAMM-EDGECONNEX-FRA11-12
Location
Heusenstamm, Germany
Operator or project company
EdgeConneX Heusenstamm GmbH
Stage
Emissions permit granted (BImSchG)
Filing date
16 Feb 2026
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
42
Generator thermal input
305 MW
Engine makes named
MTU

Source: Regierungspräsidium Darmstadt. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.