Free sample

Emissions permit granted (BImSchG)MTUCaterpillarKohler (Rehlko)

Horizon Data Center Frankfurt LLC data centre in Frankfurt am Main, Germany

Latest document dated 8 Aug 2024, from Regierungspräsidium Darmstadt. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
24
MW of generator thermal input
170

The backup fleet in the filing

Each block is one generator set: 24 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Emissions permit granted (BImSchG)

    Regierungspräsidium Darmstadt. Official document

  2. We captured the decision file

    72 facts recorded with their page. SHA-256 fingerprint 6f2d 60cb eb9c dc13…

  3. Official document online at our check

    Checked every day since 9 Nov 2026.

  4. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordDE-HE-FRANKFURT-COLT-FRA3
Location
Frankfurt am Main (Sossenheim), Germany
Operator or project company
Horizon Data Center Frankfurt LLC
Stage
Emissions permit granted (BImSchG)
Filing date
8 Aug 2024
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
24
Generator thermal input
170 MW
Engine makes named
MTU, Caterpillar, Kohler (Rehlko)

Source: Regierungspräsidium Darmstadt. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.